Project overview
The Project
The owner wanted more covered space off an existing red shop, matched to the original building.
The Build
Hammer Down formed and poured the slab beside the existing building, then framed the addition and finished it in matching red metal with a white overhead door, a walk door, and a concrete apron out front.
The Result
An addition that reads as part of the original shop, with a clean apron that drains away from the door.